A calculation model for determining number of hot metal ladle based on queuing theory with constraints of system capacity
CSTR:
Author:
Clc Number:

TF741.1

  • Article
  • | |
  • Metrics
  • |
  • Reference [19]
  • |
  • Related [20]
  • |
  • Cited by
  • | |
  • Comments
    Abstract:

    The process of ladle turnover in "one ladle to an end" mode was abstracted as three serial and nearly closed queuing systems with system capacity constraints, i.e. BF iron tapping, desulfurization and BOF iron charging queuing system. A calculation model of theoretical turnaround number of hot metal ladle based on the queuing theory with limited system capacity was proposed. Theoretical turnaround number of Chongqing Iron and Steel Co., Ltd. was calculated by adopting proposed model, and the results are:294 min for turnaround time of ladle reaching statistical balance; 17 theoretical turnaround number of ladle. Research shows that optimizing the system capacity should be a crucial step to reduce the turnaround number of ladle. The main measures of practical production lie in improving the distribution strategy of empty ladle and strengthening the coordination between iron-making and steelmaking process, et al. Corresponding parameters are obtained by adopting the calculation model, i.e. 260min for l turnaround time of ladle; 15 theoretical turnaround number of ladle.

    Reference
    [1] 殷瑞钰.冶金流程集成理论与方法[M].北京:冶金工业出版社,2013. YIN Ruiyu. Theory and method of metallurgical process integration[M]. Beijing:Metallurgical Industry Press,2013.(in Chinese)
    [2] 李金柱,王飞,杨春政.首钢京唐铁水包多功能化应用实践[J].炼钢,2014,30(4):61-64. LI Jinzhu, WANG Fei, YANG Chunzheng. Practice of multi-functional hot metal ladle technology in Shougang Jing-tang[J]. Steelmaking,2014,30(4):61-64.(in Chinese)
    [3] 杨玻,董荣华,刘浏,等.重钢铁钢界面"一罐制"技术的研究与应用[J].中国冶金,2013,23(10):17-21. YANG Bo, DONG Ronghua, LIU Liu, et al. Research and application of‘one ladle system’technology on iron steel interface in CISC[J].China Metallurgy,2013,23(10):17-21.(in Chinese)
    [4] 郑忠,龙建宇,高小强,等.钢铁企业以计划调度为核心的生产运行控制技术现状与展望[J].计算机集成制造系统,2014,20(11):2660-2674. ZHENG Zhong, LONG Jianyu,GAO Xiaoqiang, et al. Present situation and prospect of production control technology focusing on planning and scheduling in iron and steel enterprise[J]. Computer Integrated Manufacturing System,2014,20(11):2660-2674.(in Chinese)
    [5] 陈开,郑忠,周超.面向炼钢厂多机多任务天车调度的仿真方法[J].重庆大学学报,2011,34(7):39-45. CHEN Kai, ZHENG Zhong, ZHOU Chao. Simulation method for multi-machine and multi-task crane scheduling in steelmaking plant[J]. Journal of Chongqing University,2011,34(7):39-45.(in Chinese)
    [6] 蔡峻,汪红兵,贺东风,等.炼钢厂钢包周转率的影响因素[J].北京科技大学学报,2013,35(8):1072-1079. CAI Jun, WANG Hongbing,HE Dongfeng, et al. Affecting factors of the turnover rate of steel ladle in steelmaking pla-nts[J]. Journal of University of Science and Technology,2013,35(8):1072-1079.(in Chinese)
    [7] 蔡峻,贺东风,汪红兵,等.基于浇次计划的钢包周转数量计算模型[J].重庆大学学报,2013,36(11):59-65. CAI Jun,HE Dongfeng,WANG Hongbing, et al. Calculation model for the turnover number of steel ladle based on casting schedule[J]. Journal of Chongqing University,2013,36(11):59-65.(in Chinese)
    [8] 黄帮福,贺东风,田乃媛,等.鱼雷罐的运行控制[J].北京科技大学学报,2010,32(7):933-937. HUANG Bangfu, HE Dongfeng,TIAN Naiyuan, et al. Operational control of torpedo ladles[J]. Journal of University of Science and Technology,2010,32(7):933-937.(in Chinese)
    [9] 韩伟刚,郦秀萍,施一新,等.基于排队论"一包到底"模式的在线铁水包数量[J].钢铁,2013,48(5):21-24. HAN Weigang LI Xiuping,SHI Yixin, et al. Online ladle quantity of "one-open-ladle-from-BF-to-BOF" route by using queuing theory[J]. Iron and Steel,2013,48(5):21-24.(in Chinese)
    [10] 王峰.高炉连铸机区段的精准设计和生产调控[D].北京:北京科技大学,2011. WANG Feng. Precise design and production control of blast furnace-continuous caster section. Beijing:University of Science and Technology,2011.(in Chinese)
    [11] Liang S, Wang J, Wang H, et al. Simulation and optimization of material flow system for‘the mode of one open ladle’in BF-BOF region[C]//20127th International Conference on Computer Science and Education(ICCSE), July 14-17, 2012,Melbourne, VIC, Australia. IEEE,2012:716-720.
    [12] 肖鹏,何腊梅.物流仿真技术在紧凑型铁钢界面中的应用[J].炼钢,2014,30(4):70-74. XIAO Peng,HE Lamei. Application of logistical simulation to one-ladle-mode iron-making/steel-making interface[J]. Steelmaking,2014,30(4):70-74.(in Chinese)
    [13] 芦永明,王丽娜,陈宏志,等.面向钢铁制造流程的合同计划组合优化[J].东南大学学报(自然科学版),2012,42(Z1):168-172. LU Yongming,WANG Li'na,CHEN Hongzhi, et al. Combinatorial optimization of order planning for steel manufacturing process[J]. Journal of Southeast University(Natural Science Edition),2012,42(Sup1):168-172.(in Chinese)
    [14] 杨楚荣."一罐到底"铁水运输工艺铁水罐配置的优化分析[C]//第十届中国钢铁年会暨第六届宝钢学术年会论文集.北京:冶金工业出版社发行部,2015:1-5. YANG Churong. Quantity optimization and analysis of hot metal ladle for‘common ladle system’hot metal transporta-tion[C]//Proceedings of the 10th CSMS steel congress & 6th Baosteel biennial academic conference.Beijing:Metallurgical Industry Press,2015:1-5.(in Chinese)
    [15] Lin C, Ding J R, Yeh J M. A closed queuing maintenance network for automated manufacturing systems[J]. Journal of the Operational Research Society,2001,52(10):1121-1129.
    [16] Canonaco P, Legato P, Mazza R M, et al. A queuing network model for the management of berth crane operations[J]. Computers and Operations Research,2008,35(8):2432-2446.
    [17] 刘心远.基于闭环排队网络的维修系统建模和组合优化[D].北京:清华大学,2011. LIU Xinyuan. Modeling and joint optimization of a maintenance system based on closed queuing network theory[D]. Beijing:Tsinghua University,2011.(in Chinese)
    [18] 董婧.基于WITNESS的集装箱码头串联排队网络系统资源配置研究[D].上海:上海交通大学,2006. DONG Jing. Research on container terminal system of tandem open queuing network simulation based on WITNESS[D]. Shanghai:Shanghai Jiao Tong University,2006.(in Chinese)
    [19] Burke P J. The output of a queuing system[J]. Operations Research,1956,4(6):699-704.
    Cited by
    Comments
    Comments
    分享到微博
    Submit
Get Citation

谷宗喜,徐安军,贺东风,冯凯.基于有限容量排队论的铁水包个数计算模型[J].重庆大学学报,2017,40(8):70~77

Copy
Related Videos

Share
Article Metrics
  • Abstract:1332
  • PDF: 1643
  • HTML: 663
  • Cited by: 0
History
  • Received:March 24,2017
  • Online: September 05,2017
Article QR Code