The application of FTA and ANN in reliability reallocation
CSTR:
Author:
Clc Number:

TB114.3

  • Article
  • | |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • | |
  • Comments
    Abstract:

    In the process of product reliability design, usually, the distribution of reliability index is not completed in one time. Different design stages have different reliability allocation methods. With the deepening of the design process, the results of the preliminary distribution may be unsatisfactory, so it's necessary to re-allocate the reliability index in middle and late stages. Prior to the index allocation, all the minimal cut sets are classified by a certain algorithm, and then the selected minimum cut sets to be allocated are distributed by using an artificial neural network (ANN). The ultimate goal is to allocate the reliability index to the minimal cut sets or elementary events of fault tree. By comparing the initial reliability before distribution and the reliability after distribution, we can find out the weak points in product design and then improve the design, which examines the results of FMECA (failure mode, effects and criticism analysis) to some extent.

    Reference
    Related
    Cited by
Get Citation

鞠萍华,蒋德轩,冉琰.故障树和人工神经网络在可靠性再分配中的应用[J].重庆大学学报,2018,41(4):11~19

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:November 15,2017
  • Online: May 06,2018
Article QR Code