Archive > Volume 42 Issue 11 > 2019,42(11):98-107. DOI:10.11835/j.issn.1000-582X.2019.11.011 CSTR:[cstr] Prev Next

Research on anti-water pressure capability of railway tunnel lining by continuous-discontinuous element method