Research on group scheduling of optimal setup uncorrelated parallel machine based on GATS hybrid algorithm
CSTR:
Author:
Affiliation:

Clc Number:

TP278

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The uncorrelated parallel machine schedulNE.Cms_Inserting problem is a typical problem in the workshop scheduling, and the single piece small batch production mode leads to frequent job switching and a large number of setup times, which reduces equipment utilization and production efficiency. This dissertation presents a research on the scheduling of uncorrelated parallel machines based on the grouping technique, which is dependent on the setup time. According to the similarity of the resources required for workpiece processing, the workpieces are clustered and grouped, and with machine constraints condition met, the allocation of all the workpiece groups on the machines as well as the order of the workpiece groups and that within each group on the same machine is determined. In this paper, a mathematical model is constructed with the minimization of total delay time as the optimization goal and genetic tabu search (GATS) algorithm is applied to solve it. Artificial bee colony (ABC) algorithms and genetic simulated annealing (GASA) algorithms are used for case studies. The comparison results show that the proposed algorithm has better searching ability.

    Reference
    Related
    Cited by
Get Citation

宋海草,易树平,吴昌友,张顺堂,邓冠龙,刘盼,魏雪梦.基于GATS混合算法的最优作业切换不相关并行机成组调度研究[J].重庆大学学报,2020,43(1):53~63

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 28,2019
  • Revised:
  • Adopted:
  • Online: January 15,2020
  • Published:
Article QR Code