Archive > Volume 43 Issue 1 > 2020,43(1):53-63. DOI:10.11835/j.issn.1000-582X.2020.01.006 CSTR:[cstr] Prev Next

Research on group scheduling of optimal setup uncorrelated parallel machine based on GATS hybrid algorithm