Archive > Volume 43 Issue 4 > 2020,43(4):33-46. DOI:10.11835/j.issn.1000-582X.2019.257 CSTR:[cstr] Prev Next

On the solution to large-scale open-pit mine production planning problem based on AHCP algorithm