Modification test and engineering application of high-water filling material in gob-side entry retaining
CSTR:
Author:
Affiliation:

Clc Number:

TD353

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper aims to solve the poor toughness, small compressibility of high-water material. Based on the analysis of the failure characteristics of the backfilling body, the roadside backfilling body was divided into the yieldlayer and the support layer by the "yielding resistance" supporting mechanism. Orthogonal method was adopted to improve the high-water material performance, and the microstructure of the consolidated material before and after modification was compared. At the same time, simulation tests were conducted to obtain the optimal supporting conditions and material mechanical properties of backfilling body under lateral constraint conditions. The results showed that foaming agents and fibers had no effect on the formation of ettringite and other hydration products.The 28 days strength of the improved support layer consolidate body reached 12.18 MPa and the expansion rate of the yielding layer was 9.60%.The surface displacement of the optimal support combination under lateral constraint was 3.65%. The following industrial test indicated that the lateral surface displacement of filling body was only 229 mm, and the roof subsidence was controlled at about 216 mm. The high water material after modification can well meet the requirements of gob-side entry retaining.

    Reference
    Related
    Cited by
Get Citation

李西凡,熊祖强,张耀辉,苏承东.沿空留巷高水充填材料改性试验及工程应用[J].重庆大学学报,2020,43(4):94~106

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 27,2019
  • Revised:
  • Adopted:
  • Online: April 21,2020
  • Published:
Article QR Code