Train and explore of civil engineering specialty students'''' management capacity of engineering contract
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

F284-4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This author discusses the concrete requirement of management capacity of engineering contract,analyses the difficult point and focal point of training management capacity of engineering contract,recommend the relevant teaching practice.

    Reference
    Related
    Cited by
Get Citation

佘立中.土建类学生工程合同管理能力的培养与探索[J].高等建筑教育,2004,13(2):59~62

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:March 07,2004
  • Adopted:
  • Online:
  • Published:
Article QR Code