Problems and countermeasures of infrastructure construction auditingin universities and colleges
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    To improve the management of infrastructure construction and increase the benefit of investment, we presented major problems in infrastructure construction auditing of universities and colleges based on the analysis of practical working experience, analyzed the main causes of the problems from two aspects which were the construction management department and the construction unit, and proposed countermeasures. The countermeasures covered many aspects, including establishing a system of rewards and penalties, strengthening project data management and tender management, enhancing worksite management, and improving talent training.

    Reference
    Related
    Cited by
Get Citation

黄伟,刘晓芳.基建工程结算审计问题及其对策探索[J].高等建筑教育,2012,21(1):153~156

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online:
  • Published:
Article QR Code