The Application of CPA and Fuzzy Probability Analysis on Risk Evaluation of Highway Construction Schedule
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Through the risk identification of highway project’s progress of construction, the authors divide the major factors into strong index and soft index, and then establish a risk index system Using the fuzzy logic combined with probability analysis, the authors calculate and evaluate the identified risk They make the evaluation on probability analysis and fuzzy logic method simple by using the principal component analysis, and automatically empowering and reducing dimensionality of the data for risk index system Finally, it will confirm the feasibility of the method and practical significance through the test on actual cases

    Reference
    Related
    Cited by
Get Citation

蒋慧杰,吴慧博,夏立明,赵春雪.高速公路施工进度风险评价[J].重庆大学学报社会科学版,2012,18(2):87~93

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online:
  • Published: