山东禹城污水处理厂主体工艺调试经验与分析
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

X505

基金项目:


Adjusting Experience and Analysis of Primary Treatment Process in Yucheng Sewage Treatment Plant, Shandong
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    介绍了禹城污水处理厂的调试运行状况,并从培菌启动条件、设备配置、水力流态等方面对调试过程中出现的问题进行了分析与探讨,在此基础上提出了适合中小城镇污水处理厂面对进水水量波动较大,冲击负荷高的情况下的调试经验。

    Abstract:

    The adjusting operation for Yucheng wastewater treatment plant (WWTP) is introduced. In this paper, the problems during the course of testing operation from the starting condition of bacterium tamed, the installation of equipment and the hydraulic flow performance etc. are analyzed and discussed. Based on abovementioned, it is pointed out that there is some adjusting operational experience suit for middle-small town WWTP facing with bigger fluctuation of influent quantity and higher impact load.

    参考文献
    相似文献
    引证文献
引用本文

王涛,熊艾玲,邓荣森,楼少华,李烈锋.山东禹城污水处理厂主体工艺调试经验与分析[J].土木与环境工程学报(中英文),2004,26(2):129-133. WANG Tao, XIONG Ai-ling, DENG Rong-sen, LOU Shao-hua, LI Lie-feng. Adjusting Experience and Analysis of Primary Treatment Process in Yucheng Sewage Treatment Plant, Shandong[J]. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING,2004,26(2):129-133.10.11835/j. issn.1674-4764.2004.02.029

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:2003-10-16
  • 录用日期:
  • 在线发布日期:
  • 出版日期: