The problem of the short term economic scheduling for cascaded hydropower stations is discussed with the network programming method. A new network model is built to dispatch the load to each unit when the unit commitment is determined. An algorithm of the minimal cost maximal flow is also discussed using the model and the algorithm to the Longxi River Cascaded Hydropower Stations, the computational result on the microcomputer VAX II shows that the model and the algorithm are correct and applicable.