Abstract:A new method, based on the direct method of weighting multiple normal distri butions, is proposed to evaluate the production costs of two interconnected systems. It can be applied in calculation of expected power generation, reliability indexes and production coats of two interconnected systems without their load correlation. The effect of the linking line on the interconnection is also studied.