The Monitoring Measurements and Country Rock Control of NATM in Tunnel of Express Road during Construction
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    结合中梁山隧道西段现场的实测数据,分析了该段围岩变形的条件和规律,并对各类围岩的各测线进行了量测数据回归分析,导出了各类围岩的稳定性判据,给出也最佳初期支护及二次衬砌时间。

    Abstract:

    In this paper the author' s study on the monitoring measurement technique of NATM,the regularity and conditions of the country rock deformation are analysed based on the site measurement data in the west section of Zhongliangshan tunnel. The regression analysis of measure data for different measure lines of vavious country rock is done by the use of self-compiled CRAP program. The stability criterion for various rockmass and optimum time for primary and permanent support are provided. The conclusion available could conduct the theoretical research of NATM deeply as well as tunnel design and construction.

    参考文献
    相似文献
    引证文献
引用本文

刘立 唐建新.高速公路隧道施工过程的新奥法监控[J].重庆大学学报,1995,18(5):113-119.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码