Abstract:This paper analyses the cause of very slow learning rate during the time of ap-proaching the minim um poi nt in con vertional BP algorithm, by introducing weight factor into themodification of the connection weight,an improved leavning algorithm for BP model is presented,itcan sign ificantly in crease the learning rate and improve con vergent behaviour.As an illustrative ap-plication example,the n umeriCal resu It of the medium-term load forecasting is given.