三峡工程施工通航期淤积问题的试验研究
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

U617.6

基金项目:

“八五”国家重点科技攻关项目,三峡工程泥沙及航运关键技术专题


Experimental Study on Sediment Problems of Navigation in the Course of Construction in the Three Gorges Project
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    介绍了施工通航泥沙模型的研究成果,包括施工期坝区河段冲淤变化规律、临时船闸引航道泥沙淤积形态、淤积分布、淤面标高、回淤速度、碍航淤积量、淤沙级配以及淤积对明渠和临时船闸通航条件的影响等,并提出了相应的改善措施。

    Abstract:

    This paper introduces some resarch results on sediment model experiment of navigation in the course of construction. including the laws of erosion and deposit change of sediment in dam area,depositional configuration of sediment in the approaches of temporal ship lock, distribution and surface sea-level of deposition,speed of return deposition, volume of deposition of frustrating navigation, grain grade of deposition and the effect of deposition on navigable condition in open channel and temporal ship lock and so on. Some measures of amelioration are presented,which have important value to the construction of the project.

    参考文献
    相似文献
    引证文献
引用本文

杜宗伟 舒荣龙.三峡工程施工通航期淤积问题的试验研究[J].重庆大学学报,1996,19(1):10-17.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码