Abstract:In this paper,a probabilistic production simulation for the joint dispatch of multi area interconnected power system is presented.The method evaluates the expected unserved energy of the joint dispatch system and further the other basic simulation indices,based on the probability density function of the unit available capacity and the multi area demand supply feasibility conditions,and the detail is showed by a four areas case.