高速公路隧道新奥法施工监控量测
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

U456

基金项目:

国家重点实验室基金 , 中国博士后科学基金


The Monitor Measuring of Highway Tunnel in Natm
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    隧道采用新奥法原理施工时,利用围岩周边变形和拱顶下沉量的观测值可对隧道周边岩体内的应力动态过程及发展趋势、围岩稳定性以及支护的合理性进行监控,这对安全施工及保证工程质量具有重要作用.通过对崇遵高速公路风梅垭隧道的实时监控,研究了隧道围岩的稳定状况,实时确定了合理的二次衬砌施工时间,成功避免了施工中重大事故的发生,确保了隧道施工安全和质量,对隧道施工具有指导意义.

    Abstract:

    It is important that monitor measuring is applied in tunnel in regard to NATM. The monitor measuring of NATM was studied in the Fengmeiya Tunnel in Chongzun Express. Based on the regularity and conditions of the surrounding rock deformation of monitor measuring in site, the optimum time for primary and permanent support are obtained which averting successfully accidents in construction, enhancing the construction qualities and guidance to tunnel construction in Karst areas.

    参考文献
    相似文献
    引证文献
引用本文

代高飞,应松,夏才初,毛海和.高速公路隧道新奥法施工监控量测[J].重庆大学学报,2004,27(2):132-135166.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码