Considering the character of slope resistant engineering invest benefit, in line with security and economy balmaced, combining initial investment and anticipated hazard loss, disaster resistant engineering should be satisfied with the criterion of minimum cost. Decision tree model is adopted as analyzing means, and risk decision-making of slope design is carried out. Project input-output radio adopting dynamic analysis can reflect project investment benefit more accurately. At last this paper analyzes some questions in process of slope resistant engineering with benefits enumerate.