Research on Material Delivery BOM Model Based on Technical Processing
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    通过对离散制造环境下,复杂产品装配过程中零部件成套性与产品BOM的分析研究,结合ERP系统中对制造BOM信息的管理和应用,建立基于工艺流程的产品配送BOM模型,作为物料配送的依据,实现装配车间生产计划执行前的零部件成套率控制,并实时记录装配过程的零部件和产品属性信息.

    Abstract:

    Relationships between the complete set of parts and product BOM are researched in assembly process for complex products.With regard to the discrete manufacturing industry,delivery BOM model is put forward based on technical process and manufacturing BOM in Enterprise Resources Planning(ERP) application system. According to the BOM model,the task of material delivery is implemented,the complete set ratio of parts for assembly producting schedules can be achieved. In addition, dynamic attribute information of parts and products can be recorded accurately.

    参考文献
    相似文献
    引证文献
引用本文

徐建萍,郭钢.基于工艺流程的物料配送BOM模型[J].重庆大学学报,2005,28(6):19-21.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:2004-12-30
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码