Abstract:According to the characteristic of Time Limited Consumable and feature of line in Time Limited Consumable, some key technologies of if one studied, including early warning rule of product guarantee period, real time control strategy of available sale quantity when considering products being overdue, distribution pattern integration in Time Limited Consumable, and business process reengineering. On the basis of the above study, distribution management system oriented time limited consumable is constructed and implemented for validation with good effect.