基于时域的汽轮发电机暂态仿真
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TK26

基金项目:


Transient Simulation of Steam-turbine Generator Based on Time-domain
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    结合大型火电厂实时仿真机对汽轮发电机高逼真度仿真的要求,通过Park方程建立能精确描述其暂态过程的状态方程,并对时变的系统矩阵A和控制矩阵曰进行改进处理,结合四阶Runge—Kutta法得到更省计算量的数值解法.最后编写相应的仿真程序,对某360MW汽轮发电机进行突加负载仿真试验,仿真结果显示文中提出的方法适合实时仿真机的发电机模型.

    Abstract:

    For achieving the high-fidelity simulation of steam-turbine generator on the real-time simulator of coal fired plant, the paper establishs a group of state equations based on Parkg equation, which can accurately describe its transient process. Then a kind of time-saved numerical solution in terms of four-order Runge-Kutta method is proposed through the modified processing to the time-dependent system matrix A and control matrix B. Finally a program is coded to simulate the emergency load process of one 360MW steam-turbine generator, the result indicates that the method of this paper can exactly apply on the generator model of real-time simulator.

    参考文献
    相似文献
    引证文献
引用本文

蒙泽森 何祖威 杨晨.基于时域的汽轮发电机暂态仿真[J].重庆大学学报,2006,29(8):53-56.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2006-03-22
  • 最后修改日期:2006-03-22
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码