Abstract:Based on silt geological condition, aimed at cantilever pile and pile-anchor, using method of beam on elastic foundation ,through multiple combinations of pile spacing, diameter, embedded-depth at different levels of excavation depth, the impaction is discussed on the greatest displacement, maximum bending moment, the largest shear forces of supporting structure, and in different excavation, bolt locations impact on maximum horizontal displacement, the greatest moment of medial and lateral bending moment, the biggest shear force of pile and the axial force of bolt. By deformation control standards of supporting structure, the law and technically feasible program is found. Then combined with construction method of pile and current quota, technical economy is performed to find the economic plan and give suggestion to the project.