Abstract:Simulated experiments of grounding grid corrosion were conducted based on two 220 kV substation models. In initial diagnosis, the measurement nodal points were planned to great span, small piecemeal, and large piecemeal jointing fixed points. A comparative study of the three measurement plans was carried out. The results show that the large piecemeal with fixed points had the best performance and could be used as a practical method for diagnosing grounding grid corrosion.