多因子预测模型在连续梁桥中的应用
作者:
基金项目:

国家自然科学基金资助项目(60773190,60802002);湖北省科技攻关资助项目(2007AA101C47);湖北省教育厅基金资助项目(D200618001)


A multifactor forecasting model for continuous beam bridges
Author:
  • 摘要
  • | |
  • 访问统计
  • | |
  • 相似文献 [20]
  • |
  • 引证文献
  • | |
  • 文章评论
    摘要:

    为解决在连续梁桥施工过程中,对施工过程中的挠度和应力进行预测和控制这一问题。建立SCGMmv(1,h)是基于均值生成时序的多因子预测模型。将SCGMmv(1,h)预测模型与具体工程相结合,利用挠度与应力的相互关联,预测挠度值与应力值,并与GM(1,1)预测模型的预测值进行对比。实例结果表明,SCGMmv(1,h)多因子预测模型在连续梁桥施工过程中,对挠度与应力的预测是可行有效的。

    Abstract:

    It is necessary to predict and control deflection and stress in continuous beam bridge construction. SCGMmv (1, h) is a multifactor forecasting model for a time series based on the mean values. For a specific project, by using the association between deflection and stress, the SCGMmv (1, h) forecasting model is employed to obtain forecast values of deflection and stress, which are compared with the forecast values of the GM (1,1) prediction model. The results show that the SCGMmv (1, h) multifactor forecasting model is feasible and effective for deflection and stress prediction in continuous beam bridge construction.

    参考文献
    网友评论
    网友评论
    分享到微博
    发 布
引用本文

陈为真,汪秉文,胡晓娅.多因子预测模型在连续梁桥中的应用[J].重庆大学学报,2009,32(3):353-356.

复制
分享
文章指标
  • 点击次数:1422
  • 下载次数: 355
  • HTML阅读次数: 0
  • 引用次数: 0
历史
文章二维码