Abstract:Aiming at multi type and batch production system with flexible process, an optimization method for input plan based on Witness simulation is proposed. The scientific problem researched is described. Aiming at the characteristics of multi type and batch production with flexible process, the simulation logic is designed. Taking Witness as simulation platform, the simulation model combining input plan with scheduling for multi type and batch production is constructed. The effectiveness of the method is tested by simulation examination.