综放工作面回采巷道围岩变形阶段确定方法
作者:
中图分类号:

TD821

基金项目:

国家自然科学基金资助项目(51274117,51704148);"十三五"国家重大研发计划项目(2017YFC0804108);中央高校基本科研业务费资助(3142018024,3142017096);廊坊市科学技术研究与发展计划项目(2018013105)


Determination of the deformation stage of a fully mechanized caving face in the surrounding rock of mining roadway
Author:
  • QIN Hongyan

    QIN Hongyan

    Safety Engineering College, North China Institute of Science and Technology, Beijing 101601, P. R. China;Hebei Provincial Key Lab of Mine Disaster Prevention and Control, Langfang 065201, Hebei, P. R. China;Key Laboratory of Mine Thermo-motive Disaster and Prevention, Ministry of Education, Liaoning Technical University, Fuxin 123000, Liaoning, P. R. China
    在期刊界中查找
    在百度中查找
    在本站中查找
  • OUYANG Zhenhua

    OUYANG Zhenhua

    Safety Engineering College, North China Institute of Science and Technology, Beijing 101601, P. R. China;Hebei Provincial Key Lab of Mine Disaster Prevention and Control, Langfang 065201, Hebei, P. R. China
    在期刊界中查找
    在百度中查找
    在本站中查找
  • ZHAO Xidong

    ZHAO Xidong

    Safety Engineering College, North China Institute of Science and Technology, Beijing 101601, P. R. China;Hebei Provincial Key Lab of Mine Disaster Prevention and Control, Langfang 065201, Hebei, P. R. China
    在期刊界中查找
    在百度中查找
    在本站中查找
  • ZHANG Feng

    ZHANG Feng

    Key Laboratory of Mine Thermo-motive Disaster and Prevention, Ministry of Education, Liaoning Technical University, Fuxin 123000, Liaoning, P. R. China;State Key Laboratory of Coal Resources & Mine Safety, China University of Mining & Technology, Xuzhou 211116, Jiangsu, P. R. China
    在期刊界中查找
    在百度中查找
    在本站中查找
  • TRAN MinhN guyen

    TRAN MinhN guyen

    Key Laboratory of Mine Thermo-motive Disaster and Prevention, Ministry of Education, Liaoning Technical University, Fuxin 123000, Liaoning, P. R. China;Vietnam Coal-Mineral Industries Group and Coal Mining Investment Consulting Co. Ltd., Bac Giang 21000, Vietnam
    在期刊界中查找
    在百度中查找
    在本站中查找
  • 摘要
  • | |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • | |
  • 文章评论
    摘要:

    为分析综放工作面前方巷道变形特征,以河林煤矿j7401综放工作面为研究对象,采用理论分析和现场实测方法进行深入研究。根据超前支承压力的分布曲线,定义了工作面前方巷道的3个变形阶段,分别为急速变形阶段、减速变形阶段和稳定变形阶段。急速变形阶段和减速变形阶段的分界点是超前支承压力和原岩应力的交点,减速变形阶段和稳定变形阶段的分界点是超前支承压力的峰值点。对j7401工作面开采过程中的超前支承压力和巷道变形分别进行观测,并采用最小二乘拟合方法分析整理观测数据。根据超前支承压力观测数据对巷道围岩变形阶段进行划分,急速变形阶段和减速变形阶段的分界点位于工作面前方8.1 m,减速变形阶段和稳定变形阶段的分界点是工作面前方19.8 m。根据巷道变形观测数据划分变形阶段,急速变形阶段和减速变形阶段的分界点位于工作面前方8.9 m,减速变形阶段和稳定变形阶段的分界点是工作面前方20.1 m。该划分方法的两个误差分别为0.8 m和0.3 m,证明根据超前支承压力划分巷道围岩变形阶段的方法可行,精度较高。

    Abstract:

    To analyze the deformation characteristics of the mining roadway located in front of the fully mechanized top-coal caving face, we researched the j7401 fully mechanized top-coal caving face of the Helin Coal Mine with theoretical analysis and field measurement. According to the distribution curve of the advanced abutment pressure, three deformation stages of the roadway ahead of the working face are defined, which are the quick deformation stage, the deceleration deformation stage, and the stable deformation stage. The cut-off point of quick deformation stage and deceleration stage is the intersection of advanced abutment pressure and the original rock stress. The cut-off point of the deceleration deformation stage and stable deformation stage is the peak of the advanced abutment pressure. In this work, the advanced abutment pressure and roadway deformation of j7401 working face in mining were observed respectively, and the observation data was analyzed by the method of least squares fitting. The deformation of the roadway surrounding rock was partitioned based on the advanced abutment pressure observation data:the cut-off point of quick deformation stage and deceleration stage was 8.1 m ahead of the working face, and the cut-off point of deceleration deformation phase and stable stage was 19.8 m ahead of the working face. The deformation was also partitioned based on the roadway deformation observation data, in which way the cut-off point of quick deformation stage and deceleration stage was 8.9 m in front of the working face, and the cut-off point of deceleration deformation phase and stable stage was 20.1 m ahead of the working face. The deviations of the two classification methods were respectively 0.8 m and 0.3 m, indicating the method to partition the roadway surrounding rock deformation stage based on the advanced abutment pressure observation data is feasible and the precision is high.

    参考文献
    相似文献
    引证文献
    网友评论
    网友评论
    分享到微博
    发 布
引用本文

秦洪岩,欧阳振华,赵希栋,张峰,陈明元.综放工作面回采巷道围岩变形阶段确定方法[J].重庆大学学报,2019,42(12):50-59.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2019-07-08
  • 在线发布日期: 2019-11-21
文章二维码