State Key Laboratory of Power Transmission Equipment & System Security and New Technology, Chongqing University, Chongqing 400044, P. R. China 在期刊界中查找 在百度中查找 在本站中查找
State Key Laboratory of Power Transmission Equipment & System Security and New Technology, Chongqing University, Chongqing 400044, P. R. China 在期刊界中查找 在百度中查找 在本站中查找
State Key Laboratory of Power Transmission Equipment & System Security and New Technology, Chongqing University, Chongqing 400044, P. R. China 在期刊界中查找 在百度中查找 在本站中查找
State Key Laboratory of Power Transmission Equipment & System Security and New Technology, Chongqing University, Chongqing 400044, P. R. China 在期刊界中查找 在百度中查找 在本站中查找
Existing pre-evaluation methods for high-voltage distribution network project do not consider the power supply company’s investment ability and the overall techno-economic status of the whole high-voltage distribution network, which may cause great investment risk and "repetitive investment". Moreover, these methods evaluate the local network influenced by the project based on a single rather than sequential load status, which cannot reflect the local network’s condition from the perspective of the whole year. Therefore, the proposed method firstly evaluates the company’s business status(CBS) and the overall situation of the whole network(OSWN). Then the whole year’s sequential operation state of the local network is simulated and evaluated. The simulation results show that the method can reflect the influence of CBS, the OSWN and the project’s improvement effect from the perspective of the whole year.
[1] 马倩, 王博, 胡蔚, 等. 配电网建设与改造项目评价及决策优化研究[J]. 电网与清洁能源, 2015, 31(3): 11-17.Ma Q, Wang B, Hu W, et al. Study on evaluation and decision optimization of distribution network construction and innovation reconstruction projects[J]. Power System and Clean Energy, 2015, 31(3): 11-17.(in Chinese)
[2] 俞玉英, 郭铭, 郭寅昌, 等. 配电网建设改造工程评价方法[J]. 电力系统及其自动化学报, 2012, 24(5): 123-126,153.Yu Y Y, Guo M, Guo Y C, et al. Evaluation of construction and upgrading projects in distribution system[J]. Proceedings of the Chinese Society of Universities for Electric Power System and its Automation, 2012, 24(5): 123-126,153.(in Chinese)
[3] 杨柳, 吴鸿亮, 门锟. 南方电网节能与经济运行评价方法[J]. 电力系统自动化, 2014, 38(17): 31-38, 86.Yang L, Wu H L, Men K. An energy saving and economy operation evaluation method for China southern power grid[J]. Automation of Electric Power Systems, 2014, 38(17): 31-38, 86.(in Chinese)
[4] 羌丁建, 寿挺, 朱铁铭, 等. 高压配电网规划评价指标体系与综合评价模型[J]. 电力系统保护与控制, 2013, 41(21): 52-57.Qiang D J, Shou T, Zhu T M, et al. An evaluation index system and comprehensive evaluation model on high-voltage distribution network planning[J]. Power System Protection and Control, 2013, 41(21): 52-57.(in Chinese)
[5] 顾洁, 王春义, 牟宏, 等. 秩和比法在高压配电网项目评价中的应用[J]. 电力科学与技术学报, 2015, 30(1): 80-86.Gu J, Wang C Y, Mou H, et al. Application of rank-sum ratio in project evaluation of high voltage distribution network[J]. Journal of Electric Power Science and Technology, 2015, 30(1): 80-86.(in Chinese)
[6] 陶芬, 邵剑, 张步涵, 等. 基于灰色关联和模糊层次分析的城市高压配电网接线方式综合评估[J]. 水电能源科学, 2015,33(06):190-194.Tao F, Shao J, Zhang B H, et al. Comprehensive evaluation of connection modes for urban high-voltage distribution network based on grey relation analysis and analytic hierarchy process[J]. Water Resources and Power, 2015,33(06):190-194. (in Chinese)
[7] Arritt R F, Dugan R C. Value of sequential-time simulations in distribution planning[J]. IEEE Transactions on Industry Applications, 2014, 50(6): 4216-4220.
[8] Zhang N, Kang C Q, Kirschen D S, et al. Planning pumped storage capacity for wind power integration[J]. IEEE Transactions on Sustainable Energy, 2013, 4(2): 393-401.
[9] 盛万兴, 陈海, 王军, 等. 基于负荷持续曲线的配电网运行效率评价[J]. 电网技术, 2016, 40(4): 1237-1242.Sheng W X, Chen H, Wang J, et al. Operation efficiency evaluation of distribution network based on load duration curve[J]. Power System Technology, 2016, 40(4): 1237-1242.(in Chinese)
[10] 黄俊辉, 谢珍建, 祁万春, 等. 基于时序运行模拟的电网运营效率评估方法[J]. 电力建设, 2015, 36(10): 123-128.Huang J H, Xie Z J, Qi W C, et al. Operation efficiency assessment approach for power grid based on sequential operation simulation[J]. Electric Power Construction, 2015, 36(10): 123-128.(in Chinese)
[11] Ge Z Q, Liu Y. Analytic hierarchy process based fuzzy decision fusion system for model prioritization and process monitoring application[J]. IEEE Transactions on Industrial Informatics, 2019, 15(1): 357-365.
[12] Wang D, Li Z R, Dey N, et al. Case-based reasoning for product style construction and fuzzy analytic hierarchy process evaluation modeling using consumers linguistic variables[J]. IEEE Access, 2017, 5: 4900-4912.
[13] Tian G D, Zhang H H, Zhou M C, et al. AHP, gray correlation, and TOPSIS combined approach to green performance evaluation of design alternatives[J]. IEEE Transactions on Systems, Man, and Cybernetics: Systems, 2018, 48(7): 1093-1105.
[14] Q/GDW 11615-2017配电网发展规划评价技术规范[S]. 北京: 国家电网有限公司,2017.Q/GDW 11615-2017 The technical specification of evaluation on the distribution network[S]. Beijing: State Grid Corporation of China, 2017. (in Chinese)
[15] 中华人民共和国中国电网公司. Q/GDW 156-2006城市电力网规划设计导则[S]. 北京: 国家电网有限公司, 2006.State Grid Corporation of China. Q/GDW 156-2006 The code of planning and design of urban electric network[S]. Beijing: State Grid Corporation of China,2006.(in Chinese)
[16] 中华人民共和国国家经济贸易委员会. DL755-2001电力系统安全稳定导则[S]. 北京: 电力行业电网运行与控制标准化技术委员会,2001.State Economic and Trade Commission of the PRC. DL755-2001 Guide on security and stability for power system[S]. Beijing: Power Industry Grid Operation and Control Standardization Technical Committee, 2001. (in Chinese)
[17] 徐鹏, 杨胜春, 李峰, 等. 基于层次分析和变权重机制的电网安全指标计算及展示方法[J]. 电力系统自动化, 2015, 39(8): 133-140.Xu P, Yang S C, Li F, et al. Power grid security index calculation and display method based on AHP and variable weight mechanism[J]. Automation of Electric Power Systems, 2015, 39(8): 133-140.(in Chinese)
[18] 中华人民共和国国家能源局. 2015年度全国电力价格情况监管通报[R]. 北京: 中华人民共和国国家能源局,2015.National Energy Administration of PRC. National electricity price supervision report in 2015[R]. Beijing: National Energy Administration of PRC,2015. (in Chinese)