基于序贯决策的桥梁多阶段维修加固策略优化方法
CSTR:
作者:
作者单位:

1.重庆大学,山地城镇建设与新技术教育部重点实验室,重庆 400045;2.重庆大学,土木工程学院,重庆 400045;3.招商局重庆交通科研设计院有限公司,重庆 400067

作者简介:

刘纲,男,博士,教授,主要从事结构健康监测与振动控制研究,(Email)gliu@cqu.edu.cn。

通讯作者:

中图分类号:

TU311

基金项目:

国家重点研发计划项目(2021YFF0501000);中央高校基本科研业务费资助项目(2023CDJKYJH093)。


Optimization of multi-stage bridge maintenance strategies based on sequential decision-making
Author:
Affiliation:

1.Key Laboratory of New Technology for Construction of Cities in Mountain Area, Ministry of Education, Chongqing University, Chongqing 400045, P. R. China;2.School of Civil Engineering, Chongqing University, Chongqing 400045, P. R. China;3.China Merchants Chongqing Transportation Research and Design Institute Co., Ltd., Chongqing 400067, P. R. China

Fund Project:

Supported by the National Key Research and Development Program of China(2021YFF0501000), and Fundamental Research Funds for the Central Universities(2023CDJKYJH093).

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对现有维修加固策略优化方法未考虑桥梁结构全生命周期内决策顺序相互影响的问题,基于序贯决策原理提出一种多阶段双层桥梁维修加固策略优化方法。考虑前序决策行为对后续策略的影响,采用上层决策确定时序维修加固阶段的性能提升目标,并将上层决策结果作为约束条件,通过下层决策确定各阶段各构件采用的具体维修加固方案。算例分析表明,所提方法较传统策略在保持桥梁全寿命周期技术状况更优的情况下,累积成本花费将降低28.6%。当桥梁性能状况指标平均劣化速度小于1.425/年时,可通过减少维修加固决策阶段划分降低桥梁全寿命周期的累积维修加固成本。

    Abstract:

    To address the limitation of existing bridge maintenance optimization methods that fail to consider interactions between sequential decisions across the entire service life, this study proposes a multi-stage, two-level optimization framework grounded in sequential decision-making principles. The upper level model determines performance improvement goals for the maintenance sequence, while considering the influence of preceding decisions on subsequent maintenance policies. The lower-level model then identifies the optimal maintenance actions for each component at each stage, subject to the upper-level constraints. Case analysis shows that, while maintaining superior structural condition over the full life cycle, the proposed method reduces cumulative maintenance cost by 28.6% compared with the traditional strategies. Moreover, when the average deterioration rate of the performance condition index is below 1.425 per year, total life-cycle maintenance and rehabilitation cost can be further reduced by reducing the number of decision-making stages.

    参考文献
    相似文献
    引证文献
引用本文

刘纲,孙瑞卿,李琦,严琨.基于序贯决策的桥梁多阶段维修加固策略优化方法[J].重庆大学学报,2026,49(1):60-69.

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2024-05-10
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2026-01-26
  • 出版日期:
文章二维码