Abstract:The default of conventional schedule is expounded, which only emphasizes on system's overall object but overlooks sub system's local object. A mathematical model of two level multi object is put forward. The concept of relatively prior weight is defined, and a heuristic algorithm is given out. The results of computer simulation show that the algorithm is effective.